Project

WAREHOUSE DISTRIBUTION CENTER, PHASE II – PHILADELPHIA, PA

Location Philadelphia, PA
Completion 2021
Services Construction Management
Size 71 acres

SOCO Construction was awarded to manage Phase II of the package distribution center project located in Philadelphia, Pennsylvania. Scope of work includes site-work located on lot 2703 Black Lake Place. This 7.1 acre site will provide on-grade parking for 376 vans.

Construction includes mass earthwork cuts, fills, and exports, along with soil stabilization with lime additives. Installations include pole-mounted site lighting, a new PECO electrical transformer, underground vault, and electrical service equipment to power the site lighting throughout. Installations also include new concrete curbs and sidewalks, heavy-duty pavement with markings, landscaping with two Bio Basins, along with site fencing and railings throughout.

Construction consists of one underground stormwater management basin with a control structure, stormwater drainage systems, and the storm sewer tie-in to Philadelphia’s storm sewer system. Off-site work includes the reconstruction of ADA sidewalk ramps at McNulty & Black Lake Place, upgrades of traffic signaling at Southampton & McNulty and at Southampton & Townsend, along with pavement re-striping on McNulty.